Case II
   
 
 
Client Name :- RPG Life Sciences
Project Location :- Navi Mumbai, India
Facility Type :- API Facility   
Project Duration : -  14 months
Project Cost : -  Rs. 190 million
Services Provided : -  – Basic Engineering
– Detailed Engineering
– Commissioning
 
Key Project Features:

The New API Facility is constructed on an existing site of RPG. Area of production block is approx. 1500 sq. meters. It is an USFDA approvable facility.

The new facility has two modules – one dedicated for manufacturing Azathioprine, and another for manufacturing multi-products like Haloperidole, Risperidone, Lamotrigine, etc.

 
Project Execution:

The project was unique since we had to fit the layout within the working site using existing utilities without any major shutdown except for hook-up.

The layout was planned with central enclosed pipe rack for two modules with service area. This resulted in reduction in total piping and cabling length.

The Enclosed systems such as condensers were taken out of reactor area; this has resulted in improving clean ability of reaction area.

A multi utility header is provided in the service area with pneumatic operations. These valves were interlinked to avoid mix-up of utilities during utility change over.

 
Achievement:
The project was completed with in the sanctioned budget.
   
 
 
 