The Oncology facility was constructed with an area of production block of approx. 1000 Sq.M. The project cost was Rs. 120 million which was completed in 10 months duration.
This facility of G+1 structure was planned to set up for manufacturing Oncology product with the future feasibility to scale up 10 times greater volume of reactor.
Containment measures such as isolators were used during handling of potent material in powder form.
Special measures such as deactivation of potent liquid waste prior to discharge in to the main ETP and filtration of exhaust air thru ULPA filters were employed.
This facility has been approved by USFDA. |