This project was transformation of existing quality control laboratory into a kilo lab with an area of 2000 Sq.M with a cost of Rs. 200 million and a duration of 8 months
This project was transformation of existing quality control laboratory in to a kilo lab manufacturing facility without disturbing the perspective view of the building. This facility was set up to carry out the validation batches & for scaling up generic drugs of various groups
The API manufacturing facility of G+2structure was constructed in existing building of Dr. Reddys Laboratories Ltd. Unit CTO-III. Area of the existing building is approx 2000 sq mt. It is one of the most fast track project designed, engineered & erected in mere 8 Months. |